Thermal energy storage for increased waste heat recovery at a silicon production plant in Norway

Bidragsytere:
  • Daniel Rohde
  • Anton Beck
  • Paul Wilpert
  • Sabrina Dusek
  • Magnus Kyrre Windfeldt og
  • Leif Erik Andersson

Tidsskrift

Applied Thermal Engineering
ISSN 1359-4311
e-ISSN 1873-5606
NVI-nivå 1

Om resultatet

Vitenskapelig artikkel
Publiseringsår: 2022
Publisert online: 2022
Trykket: 2022
Volum: 215
Artikkelnummer: 118909
Open Access

Importkilder

Scopus-ID: 2-s2.0-85133909637

Beskrivelse Beskrivelse

Tittel

Thermal energy storage for increased waste heat recovery at a silicon production plant in Norway

Sammendrag

The production of silicon is an energy-intensive process, which requires high temperatures. Sudden release of high-temperature gas to the exhaust system is an inevitable part of silicon furnace operation and causes strong fluctuations in the waste heat recovery system. This makes waste heat recovery challenging and leads to frequent throttling of the produced steam reducing the efficiency of the system. To avoid this throttling and thus increase system efficiency, retrofitting a thermal energy storage to the existing waste heat recovery system is analyzed for a silicon production plant in Norway. A steam accumulator installed in parallel to existing bypasses, which does not interfere with the existing waste heat recovery system, is found to be ideally suited for the case. The analysis is carried out using real plant data, which is used to calibrate a dynamic simulation model modelled in the Modelica language. Design parameters of the steam accumulator are identified based on economic optimizations and their performance is verified with the dynamic simulation model. The simulation results shows that the simplifications in the economic optimizations are acceptable and that storage sizes of less than 10 m3 can lead to annual profits of around 23 k€. Investment costs excluding transport and on-site installation are around 120 k€, yielding payback times from three to six years, depending on public funds. Including transport and on-site installation the payback times increase to about seven to ten years. The integration of a storage of this size was deemed realistic by the plant operators. The results will therefore be used for the creation of a business case with a more detailed cost analysis.

Bidragsytere

Daniel Rohde

  • Tilknyttet:
    Forfatter
    ved Gassteknologi ved SINTEF Energi AS

Anton Beck

  • Tilknyttet:
    Forfatter
    ved Austrian Institute of Technology

Paul Wilpert

  • Tilknyttet:
    Forfatter
    ved Elkem AS

Sabrina Dusek

  • Tilknyttet:
    Forfatter
    ved Austrian Institute of Technology

Magnus Kyrre Windfeldt

  • Tilknyttet:
    Forfatter
    ved Gassteknologi ved SINTEF Energi AS
1 - 5 av 6 | Neste | Siste »