Cristin-resultat-ID: 1235118
Sist endret: 30. juni 2015, 09:57
NVI-rapporteringsår: 2015
Resultat
Vitenskapelig artikkel
2015

Task complexity as a performance shaping factor: A review and recommendations in Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) adaption

Bidragsytere:
  • Martin Rasmussen
  • Martin Inge Standal og
  • Karin Laumann

Tidsskrift

Safety Science
ISSN 0925-7535
e-ISSN 1879-1042
NVI-nivå 2

Om resultatet

Vitenskapelig artikkel
Publiseringsår: 2015
Publisert online: 2015
Trykket: 2015
Volum: 76
Sider: 228 - 238

Importkilder

Scopus-ID: 2-s2.0-84925769275

Beskrivelse Beskrivelse

Tittel

Task complexity as a performance shaping factor: A review and recommendations in Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) adaption

Sammendrag

This review is part of the PetroHRA project that aims at adapting human reliability analysis to the petroleum industry. The different elements that make up complexity are reviewed through a thematic analysis which identified 83 complexity elements that were categorized into 13 complexity categories. Six of these were found to be relevant and were included in the “Task Complexity” performance shaping factor which is presented in this paper. The description of “Task Complexity” includes levels and multipliers.

Bidragsytere

Martin Rasmussen Skogstad

Bidragsyterens navn vises på dette resultatet som Martin Rasmussen
  • Tilknyttet:
    Forfatter
    ved Institutt for psykologi ved Norges teknisk-naturvitenskapelige universitet

Martin Inge Standal

  • Tilknyttet:
    Forfatter
    ved Institutt for psykologi ved Norges teknisk-naturvitenskapelige universitet

Karin Laumann

  • Tilknyttet:
    Forfatter
    ved Institutt for psykologi ved Norges teknisk-naturvitenskapelige universitet
1 - 3 av 3