Cristin-resultat-ID: 1280936
Sist endret: 1. april 2017, 18:29
NVI-rapporteringsår: 2015
Resultat
Vitenskapelig artikkel
2015

Project Evaluation Holistic Framework - Application on Megaproject Case

Bidragsytere:
  • Youcef Zidane
  • Agnar Johansen og
  • Anandasivakumar Ekambaram

Tidsskrift

Procedia Computer Science
ISSN 1877-0509
e-ISSN 1877-0509
NVI-nivå 1

Om resultatet

Vitenskapelig artikkel
Publiseringsår: 2015
Publisert online: 2015
Trykket: 2015
Volum: 64
Sider: 409 - 416

Importkilder

Scopus-ID: 2-s2.0-84962788299

Beskrivelse Beskrivelse

Tittel

Project Evaluation Holistic Framework - Application on Megaproject Case

Sammendrag

This paper is about developing a holistic framework for project evaluation; it is applied in a case study of an Algerian highway megaproject. This project has attracted the attention of all the local media and even many of the international media. Several media discussions on the project are limited to the completion of the project itself seen in a short-term perspective. In this regard, the discussions were notably associated with delays and expenditures coming in over budget, which is project efficiency signified by aspects such as time, cost and the scope. One reason that made the media focus only on these aspects is that they can easily be measured and are usually the first criteria against which the project can be assessed. The relevance of the project and its effects, whether it attains its goals and objectives measured in terms of effectiveness, including impact and sustainability – all these four measures can only be verified at a later stage, after the project has delivered its results. These are much broader aspects and are therefore difficult to measure. This paper is about developing an ex-post evaluation framework model. This is achieved by going through the different definitions of the measures of project success or failure and then reflecting on them with respect to the whole project life cycle by considering all the process groups in the project (i.e., conception phase, front-end analysis phase, planning and design phase, engineering phase, procurement phase, construction phase, closing phase and operating phase). This would provide us with a holistic way of evaluating projects.

Bidragsytere

Youcef Zidane

  • Tilknyttet:
    Forfatter
    ved Institutt for maskinteknikk og produksjon ved Norges teknisk-naturvitenskapelige universitet

Agnar Johansen

  • Tilknyttet:
    Forfatter
    ved Mobilitet ved SINTEF AS

Ekambaram Anandasivakumar

Bidragsyterens navn vises på dette resultatet som Anandasivakumar Ekambaram
  • Tilknyttet:
    Forfatter
    ved Mobilitet ved SINTEF AS
1 - 3 av 3