Cristin-resultat-ID: 1542540
Sist endret: 15. januar 2018, 10:37
Resultat
Rapport
2017

Miljøoppfølging E136 Tresfjordbrua. Sluttrapport

Bidragsytere:
  • Gunhild Borgersen
  • Marijana Stenrud Brkljacic
  • Janne Kim Gitmark
  • Lars Gunder Golmen
  • Magdalena Kempa
  • Anna Birgitta Ledang
  • mfl.

Utgiver/serie

Utgiver

Norsk institutt for vannforskning

Serie

NIVA-rapport
ISSN 1894-7948

Om resultatet

Rapport
Publiseringsår: 2017
Hefte: 7201
Antall sider: 124
ISBN: 978-82-577-6936-9
Open Access

Klassifisering

Vitenskapsdisipliner

Matematikk og naturvitenskap

Emneord

Økologisk tilstand • Tresfjordbrua • Hydrografi og vannkvalitet • Strømmåling og modellering

Beskrivelse Beskrivelse

Tittel

Miljøoppfølging E136 Tresfjordbrua. Sluttrapport

Sammendrag

Statens Vegvesen har ferdigstilt bru over Tresfjorden, en utbygging som også omfatter en sjøfylling. NIVA har utført miljøundersøkelser og modellberegninger av forholdene før og etter anleggsvirksomheten for å vurdere om utbygging medførte vesentlige endringer i forholdene i fjorden. Utbyggingen har medført en generell økning i strømhastighet som varierer med vindretning og vindhastighet, men har ikke påvirket temperaturforhold, saltholdighet og bølgeforhold i fjorden. Plante- og dyrelivet i fjæra, og dyrelivet på dypere vann viser ikke tegn på dårligere tilstand etter utbyggingen. Alt i alt viser denne undersøkelsen at brua og utbyggingen ikke har ført til alvorlige konsekvenser for miljøet i fjorden.

Tittel

Environmental monitoring – E136 Tresfjord bridge

Sammendrag

The Norwegian Public Roads Administration (Statens Vegvesen) has in 2015 compledet a new bridge over the fjord Tresfjord in Møre og Romsdal county. The bridge is approx. 1.2 km long with an 850 m long embankment from Vikebukt. Construction work started in 2012, and Norwegian Institute for Water Research (NIVA) has conducted several surveys of the fjord (2010 and 2011) as a basis to monitor the environment and with follow up surveys (2016 and 2017) after the bridge has been completed. This report presents the results from the after surveys and discuss these in relation to the before results. The discussion and conclusions are presented in a short section in the beginning of the present report, followed by comprehensive presentations of data from the different topics of the surveys. Overall assessment: Construction of a bridge with the embankment approx. 800 m from Vikebukt has led to a general increase in current speed as the same water masses driven by the tides shall now pass a narrower opening of the fjord. None of the results indicate however that the bridge will have major consequences on the physical, chemical or biological environment in Tresfjorden.

Bidragsytere

Gunhild Borgersen

  • Tilknyttet:
    Forfatter
    ved Marin biologi ved Norsk institutt for vannforskning

Marijana Stenrud Brkljacic

  • Tilknyttet:
    Forfatter
    ved Marin biologi ved Norsk institutt for vannforskning

Janne Kim Gitmark

  • Tilknyttet:
    Forfatter
    ved Marin biologi ved Norsk institutt for vannforskning

Lars Gunder Golmen

  • Tilknyttet:
    Forfatter
    ved Marin biogeokjemi og oseanografi ved Norsk institutt for vannforskning

Magdalena Kempa

  • Tilknyttet:
    Forfatter
    ved Marin biogeokjemi og oseanografi ved Norsk institutt for vannforskning
1 - 5 av 8 | Neste | Siste »