Cristin-resultat-ID: 1577983
Sist endret: 3. desember 2018, 11:03
NVI-rapporteringsår: 2018
Resultat
Vitenskapelig artikkel
2018

Stochastic electricity dispatch: A challenge for market design

Bidragsytere:
  • Endre Bjørndal
  • Mette Bjørndal
  • Kjetil Trovik Midthun og
  • Asgeir Tomasgard

Tidsskrift

Energy
ISSN 0360-5442
e-ISSN 1873-6785
NVI-nivå 2

Om resultatet

Vitenskapelig artikkel
Publiseringsår: 2018
Publisert online: 2018
Trykket: 2018
Volum: 150
Sider: 992 - 1005
Open Access

Importkilder

Scopus-ID: 2-s2.0-85043987833

Beskrivelse Beskrivelse

Tittel

Stochastic electricity dispatch: A challenge for market design

Sammendrag

We consider an energy-only electricity market where some generation and/or load is uncertain, and where there are flexibility costs, i.e. some conventional power plants have to be scheduled well before real time in order to participate in the dispatch, while for others, additional cost incurs if generation plans have to be adjusted close to real time. In practice, electricity markets are often organized with sequential market clearing, and in this paper, we consider two sequential markets, for instance representing a day-ahead and a real-time market. We compare the outcomes of 1) a stochastic market clearing model, i.e. an integrated model that takes into account both markets and the uncertainty, to 2) a myopic market clearing model, where the first market is cleared based only on given bids, and not taking into account neither the uncertainty nor the bids to the second market. Compared to previous literature, our main contribution is that we compare the two different market models with respect to both efficiency and allocation of surplus, and thus the incentives they imply for the market participants. We discuss what information is needed in market agent bids and how that information can be manipulated. While the stochastic market clearing gives a solution with a higher expected social welfare, it poses several challenges for market design. The stochastic dispatch may lead to a dispatch where the day-ahead prices deviate from the bid curves to the first market. This can lead to incentives for self-scheduling, in that it may require market participants to accept prices that deviate from the marginal costs or benefits corresponding to the scheduled quantities. Our analysis shows that the intermittent producer has an incentive to deviate from the system optimal plan in both the myopic and stochastic model, and this incentive is particularly strong under the myopic model. We also discuss how the expected social welfare of the market outcome under stochastic market clearing depends on the quality of the information that the system operator will base the market clearing on. In particular, we show that an intermittent producer may have an incentive to misreport the probability distribution for its generation.

Bidragsytere

Endre Jostein Bjørndal

Bidragsyterens navn vises på dette resultatet som Endre Bjørndal
  • Tilknyttet:
    Forfatter
    ved Samfunns- og næringslivsforskning AS
  • Tilknyttet:
    Forfatter
    ved Institutt for foretaksøkonomi ved Norges Handelshøyskole

Mette Bjørndal

  • Tilknyttet:
    Forfatter
    ved Institutt for foretaksøkonomi ved Norges Handelshøyskole
  • Tilknyttet:
    Forfatter
    ved Samfunns- og næringslivsforskning AS

Kjetil Trovik Midthun

  • Tilknyttet:
    Forfatter
    ved Bærekraftig energiteknologi ved SINTEF AS

Asgeir Tomasgard

  • Tilknyttet:
    Forfatter
    ved Institutt for industriell økonomi og teknologiledelse ved Norges teknisk-naturvitenskapelige universitet
  • Tilknyttet:
    Forfatter
    ved Bærekraftig energiteknologi ved SINTEF AS
1 - 4 av 4