Cristin-resultat-ID: 695267
Sist endret: 18. oktober 2016, 11:19
Resultat
Vitenskapelig foredrag
2005

Lessons Learnt from Telecommunication Providers Lacking Knowledge of Effective Technology Enhanced Distance Education Solutions

Bidragsytere:
  • John Birger Stav
  • Roger Bergh og
  • Robin Støckert

Presentasjon

Navn på arrangementet: The IADAT International Conference on Telecommunications and Computer Networks
Sted: Portsmouth
Dato fra: 26. september 2005
Dato til: 29. september 2005

Om resultatet

Vitenskapelig foredrag
Publiseringsår: 2005

Importkilder

ForskDok-ID: r05014530

Klassifisering

Emneord

Akustikk

Beskrivelse Beskrivelse

Tittel

Lessons Learnt from Telecommunication Providers Lacking Knowledge of Effective Technology Enhanced Distance Education Solutions

Sammendrag

Effective use of visual communication and collaboration tools within distance training programs, require proper design of the infrastructure and instalment of composite audio-visual equipment into digital classrooms and videoconferencing studios. It is particular important to design infrastructure solutions that fit the pedagogical methodologies of the subject thought, covering both the broadcasting phase and the receiving phase at an endpoint. Detection of sound and design of the steering system are pointed out as critical factors within the design of the infrastructure. Distance educational organisations planning to install videoconferencing solutions should expect to spend 10 ? 30 % of their budget towards design and consultancy. Such services should contain independent consultancy, as regards to the often biased information given by the audio-video industry, targeting i) main teaching principles to be used in various subjects, ii) state of the art technical audio-video competence, iii) acoustical principles, iv) design of the steering system and interconnections of composite equipment, v) expected technological developments during the next couple of years, and vi) identifying new skills of teachers. Proper specifications off end-user requirements that constitute to be the basis for tenders are the first important obstacle an organization must solve in order to obtain quality assurance of the installation process. Only the high end-user requirements are specified without entering into any detailed technical discussions and specifications.

Bidragsytere

John Birger Stav

  • Tilknyttet:
    Forfatter
    ved Institutt for fysikk ved Norges teknisk-naturvitenskapelige universitet

Roger Bergh

  • Tilknyttet:
    Forfatter
    ved Institutt for bygg- og miljøteknikk ved Norges teknisk-naturvitenskapelige universitet
Aktiv cristin-person

Robin Støckert

  • Tilknyttet:
    Forfatter
    ved Institutt for matematiske fag ved Norges teknisk-naturvitenskapelige universitet
1 - 3 av 3